contact@mtbmodules.com +48 793 633 019 Mon–Fri: 8.00 am–4.00 pm CET
The Flat Pack™ global system
MTB Modules
EN
Get in touch with us
A model with an attic

MTB ELEVEN

A compact house with an attic
in the Flat Pack™ system

MTB ELEVEN – a spacious family home with an open-plan loft** The ‘MTB ELEVEN’ house has been designed with families in mind who need plenty of space whilst wishing to retain the freedom to customise the interior layout. It is one of the most spacious models in the MTB Modules range — its major advantage is the spacious living area on the ground floor and the almost entirely open-plan loft, which the future owner can arrange according to their own needs. In the ELEVEN 1 model documentation, the loft has been left as a single open space with a floor area of approximately 90 m² / 968.8 sq ft. The ground floor features a spacious living area with a lounge and kitchenette, two separate bedrooms, a large bathroom and convenient circulation. As a result, even the basic layout provides comfortable living conditions for everyday life, and the ground floor can function independently of how the upper storey is utilised. However, it is the loft that offers the greatest potential. Rather than imposing a fixed room layout, we leave it as an open space for individual customisation. You can create a large leisure area, a study, additional bedrooms, or even expand the layout to include up to four rooms and a bathroom. As a result, ELEVEN can evolve in line with the residents’ needs — from a spacious family home to a layout offering a large number of separate rooms. ELEVEN is available in 7 variants – from 7.1 to 7.7 – which differ primarily in the number and arrangement of glazed areas. Model 7.1 is the base version of the range and features 4 roof windows, whilst the other variants are fitted with 8 roof windows, allowing the loft to receive even more natural light. The documentation for the base ELEVEN 1 model confirms the use of four roof windows. MTB ELEVEN combines a classic house design with modern Flat Pack™ technology and exceptional flexibility in layout. It is a home for people who do not want to adapt their lives to a pre-defined room layout — they prefer to create a space exactly as they need it.

Total: 210.52 m² / 2,266.0 sq ftground floor: 105.26 m² / 1,133.0 sq ft + loft: 105.26 m² / 1,133.0 sq ft
Flat Pack™a complete installation kit
Productionup to 60 days
Installationfrom 3 people, approximately up to 20 days
Gallery

See the MTB ELEVEN

See what this house looks like at various stages — from visualisations, through completed projects, to the interiors and the construction process. Well-thought-out design, swift completion, tangible results.

Fittings and interior finishes are not included in the standard Flat Pack package.

Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Exterior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Interior
Exterior
Exterior
Interior
Interior
Interior
Interior
ELEVEN NIGHT
MTB ELEVEN 7.1–7.7

One house. Seven options.

Choose a glazing layout to suit your home. All ELEVEN variants retain the same overall shape and floor area. They differ in the number and arrangement of the windows, allowing you to decide how the interior opens up to light and the surroundings.

Base MTB ELEVEN 7.1
MTB ELEVEN 7.1
Base scenario
4 roof windows. The most cost-effective glazing arrangement.
MTB ELEVEN 7.2
MTB ELEVEN 7.2
More light in the loft
8 roof windows. Extended glazing arrangement.
MTB ELEVEN 7.3
MTB ELEVEN 7.3
Glazing of the gable wall
8 roof windows. An additional window at the top of the façade.
MTB ELEVEN 7.4
MTB ELEVEN 7.4
Glazing on both sides
8 roof windows. Additional glazing on the gable walls.
MTB ELEVEN 7.5
MTB ELEVEN 7.5
A more open ground floor layout
8 roof windows. An extensive layout of windows and balcony doors.
MTB ELEVEN 7.6
MTB ELEVEN 7.6
Large glazed areas
8 roof windows. More glazing on the ground floor and in the loft.
MTB ELEVEN 7.7
MTB ELEVEN 7.7
The most open version
8 roof windows. The most comprehensive ELEVEN glazing system.

Who is this house for?

It’s ideal as a first home, a comfortable living space for a family, or a rental investment.

First home

Modern, energy-efficient and ready for year-round living.

A house suitable for year-round living

A comfortable space for everyday living all year round.

Investment property for let

An attractive property with potential for both short- and long-term lettings.

A house on its own plot

A fully-fledged home for people who want to live closer to nature and on their own terms.

What do you buy at Flat Pack™?

You receive a complete, numbered set of components ready for self-assembly. We supply all the components needed to assemble the structure and finish the exterior of the building. Once assembled, the house is sealed and secured, whilst the interior remains ready for the installation of services and further finishing work in accordance with your design and requirements. It is the customer’s responsibility to prepare the foundation slab and connect the necessary services to it. You must also install the utility connection points in accordance with our technical guidelines. You will find the foundation slab design and guidelines on the layout and preparation of installation points in the downloadable materials.

MTB ELEVEN - Flat Pack™ MTB ELEVEN - Flat Pack™
Structural design and SIP panels
  • SIP panels designed for use in external walls, partition walls, ceilings and roofs,
  • a timber-frame structure made from certified C24 timber, prepared for the installation of external walls, internal partition walls, the floor slab and the roof.
Roof and façade
  • roof membrane,
  • wall membrane,
  • anthracite-coloured standing seam metal roofing,
  • A complete façade system: 20 cm / 7.87 in polystyrene, fixing plugs, reinforcement mesh, adhesive, primer emulsion, starter beads, corner and window beading, and white silicone plaster,
  • external window sills in anthracite, with the exception of those fitted to balcony windows on the ground floor — these are to be fitted by the Developer,
  • an anthracite-coloured concealer stick.
Windows and external doors
  • triple-glazed PVC windows — anthracite on the outside and white on the inside,
  • triple-glazed wooden roof windows,
  • an anthracite-coloured external security door,
  • a set of fittings and handles.
Fitting accessories
  • structural screws,
  • fasteners,
  • construction foam, including an application gun,
  • silicones,
  • a stapler with staples,
  • a grater for polystyrene.
Instructions and documentation
  • step-by-step assembly instructions,
  • 2D technical drawings,
  • a complete bill of materials (BOM),
  • warranty card.
All components are precisely fitted and clearly numbered, making assembly simple, organised and intuitive.

Each component has a designated position and number, ensuring that the entire assembly process runs smoothly, quickly and in a fully predictable manner.

Configurator

Configure your ELEVEN MTB

Select the range, installation, market and optional extras, and you’ll see a full price summary straight away.

1
Set variant

Select a Flat Pack™ set option.

2
Select the ELEVEN option

All variants have the same body shape and surface area. They differ in their glazing configurations. The base model is the MTB ELEVEN 7.1.

3
Installation

Select the method for carrying out the assembly on site.

4
Construction project (Poland only)

A completed building design for submission / planning permission.

5
Market and currency

Please select the market and the currency in which you would like to receive a quote.

6
Additional options / packages

Select additional components and installation packages.

Installation of accessories is to be carried out by the customer only. The offer covers components only; it does not include on-site installation or external connections.

Installation packages cover components inside the building. They do not include external connections, power supply, foundation penetrations, installation or final inspections.

From the enquiry
for installation

Flat Pack™ is a well-thought-out process — from the initial contact right through to the finished house. We operate efficiently, transparently and with your convenience in mind, both in Poland and in our export markets.

1Contact and configuration

We discuss your requirements, design your home and put together a bespoke proposal.

up to 24 hours for a reply
250/50 split

Payment for Flat Pack™ We charge 50 per cent of the Flat Pack™ kit’s value at the time of ordering. The remaining 50 per cent must be paid before the kit is dispatched from the factory or warehouse for collection or delivery. Delivery and assembly We deliver the Flat Pack™ kit to the address you specify. Assembly can be carried out by you, by a local team or — in selected markets — by our partners.

50% / 50%
3Manufacturing and assembly

We manufacture the modules at our factory and pack them for transport using the Flat Pack™ system.

up to 60 days
4Delivery and fulfilment

MTB delivers the Flat Pack kit to the specified address. Assembly can be carried out by the customer themselves, by a local team or by a partner — depending on the market and availability. Outside Poland, assembly is organised locally by the customer or arranged on a case-by-case basis upon request.

You can check and calculate the delivery cost directly in the configurator.

For overseas markets

We supply Flat Pack™ homes to international markets. MTB’s support covers configuration, technical documentation and logistics, whilst assembly, unloading and local formalities are organised locally by the client or contractors. MTB’s technical documentation serves as the basis for adaptation by a local architect in accordance with the regulations of the country in question.

Export-ready

We design MTB houses as a Flat Pack™ system suitable for international transport. The components are prepared in such a way as to facilitate loading, transport, unloading and assembly at the site.

Documentation

We provide the technical, commercial and export documentation required to process the order, arrange transport and facilitate the local assembly of the Flat Pack™ house.

Local partners

Installation can be carried out by the customer themselves, by the customer’s local team or — in selected markets — with the support of a partner. We confirm the availability of installation on a case-by-case basis for each location.

Technical specifications

Plans and technical specifications

Ground floor plan of the MTB ELEVEN

Conceptual drawing. Fixtures and fittings are not included in the offer.

Thickness of external walls
42 cm / 16.54 inInsulation throughout the wall: 35 cm / 13.78 in
External walls
U-value: 0.12 W/m²K / 0.021 Btu/(h·ft²·°F), R-value: 8.33 m²K/W / R-47.3Heat transfer coefficient
Thickness of the roof
46 cm / 18.11 inInsulation throughout the roof: 35 cm / 13.78 in
Roof / loft
U-value: 0.09 W/m²K / 0.016 Btu/(h·ft²·°F), R-value: 11.11 m²K/W / R-63.1Heat transfer coefficient

Quality and materials

SIP panels, C24-certified structural timber and energy-efficient external windows and doors — these are the standard components of every Flat Pack™ kit.

C24 timber

Swedish Scandinavian spruce, grade C24 — strong, stable and kiln-dried structural timber, sourced from trees growing in a harsh, cool climate.

SIP panels

Highly insulating SIP panels with a 15 cm / 5.91 in EPS core, supplemented by an additional 20 cm / 7.87 in layer of EPS within the façade system. Total insulation thickness in the partition: 35 cm / 13.78 in, ensuring very high thermal and acoustic insulation.

Certified materials

All the materials used have the required quality certificates and are sourced from reputable European manufacturers.

Up to 25 years’ warranty

Up to a 25-year guarantee on the structure and key components of the building — even if you assemble it yourself.

Files and multimedia

Downloads

Price lists, technical drawings, data sheets and multimedia materials for the ELEVEN MTB model. These materials will be updated and managed via the CMS panel.

About the house6

MTB ELEVEN is a large family home designed for clients requiring maximum interior flexibility. The layout and floor area of this model are described in the product sheet as 210.52 m² (105.26 m² ground floor + 105.26 m² loft).

The MTB ELEVEN design features: on the ground floor, a large living area, two bedrooms and a bathroom; the loft has been left largely as an open-plan space for individual customisation. The current floor plan of the model shows the detailed layout of the rooms.

No. The furniture, furnishings and interior design shown in the visualisations are for illustrative purposes only. The scope of the order is as set out in the configuration and the PDF quotation.

Yes. The MTB ELEVEN is marketed as a building suitable for year-round use. Thermal comfort depends not only on the kit itself, but also on correct installation, the design of the systems, the heating method and the quality of the finishing layers.

Yes, MTB ELEVEN can also be used as a rental property, provided that the layout and standard of finish are in line with the intended use and local requirements. For rental projects, it is advisable to plan the number of sleeping places, installations, durable finishing materials and technical support right from the start.

Yes. The latest drawings, dimensions and specifications for the MTB ELEVEN can be found on this model’s page. When placing an order, you should always use the documentation provided for that specific order, rather than older screenshots or previously saved materials.

Contents of the set11

In this version, the ELEVEN MTB kit comprises the structure and the components required for the external enclosure of the building: the roof, façade, windows and external doors, in accordance with the model’s configuration. The interior remains to be fitted out and finished.

The investor is responsible for any elements not specified in the configuration and quotation, in particular the preparation of the foundations, external connections and the fitting out and finishing of the interior, unless these have been selected as a separate package of components.

The ‘Insulated Structure’ option for the MTB ELEVEN includes a pre-assembled structure, wall and roof cladding, and insulation in accordance with the model’s configuration. In the configurator, you can select individual external elements and upgrade the package to the ‘Externally enclosed house’ variant.

No. The ‘Building enclosed from the outside’ option refers to a building that is enclosed from the outside in accordance with the scope of the configuration. The interior remains to be fitted out and finished. Finished flooring, the heating system and the installation work are not automatically included in the basic option, unless the relevant item has been selected in the configurator as an additional component package.

Yes. By selecting the ‘Insulated structure’ option, you can choose only the extensions you need. The client may carry out the work on the elements omitted from the order themselves, using their own materials and in accordance with their own finishing design, whilst complying with the technical requirements of the structure.

The ELEVEN MTB kit contains the components and accessories specified by MTB for the selected scope, including structural components and the external and assembly materials indicated in the configuration. The exact list of items for a specific kit is set out in the BOM and the order documentation. The team’s reusable tools and construction equipment are not automatically included in the kit.

The MTB ELEVEN standard specification includes PVC windows with triple-glazed units. The exact layout, dimensions and number of windows depend on the model variant selected and the order configuration.

The MTB ELEVEN standard specification includes an anthracite-coloured external security door. The exact model and specifications are confirmed in the specifications for each individual order.

At MTB ELEVEN, we use a metal guttering system as standard, tailored to the roof’s geometry and the set of flashings.

No. The finishing and treatment of the foundation are the responsibility of the client. This also applies to external window sills and thresholds for balcony windows and front doors, unless otherwise specified in the specific quotation.

Yes. The flashings are prepared and bent to fit the specific locations indicated in the MTB ELEVEN documentation. The fitter is supplied with components assigned to the relevant stages and assembly details; it is then the fitter’s responsibility on site to fit and secure them correctly in accordance with the instructions.

Insulation1

The current technical data sheet for the MTB ELEVEN specifies the following for external walls: 42 cm; insulation 35 cm; U = 0.12 W/m²K. For the roof: 46 cm; insulation 35 cm; U = 0.09 W/m²K.

Design4

MTB ELEVEN is part of the Flat Pack™ system and uses prefabricated SIP panels and certified C24 structural timber. The components are prepared and numbered in the factory before being delivered to the building site.

The heaviest standard structural components, primarily SIP panels, generally weigh up to around 75 kg. This means that most components can be handled by a team of several people without the need for a crane. The exception is large front glazing units – for their installation, we recommend 3–4 people and suction cups for the glass panes.

SIP technology can achieve high resistance to wind loads, but the structural design, connections, anchoring and local loads also determine the safety of the entire building. SIP systems are tested and used in hurricane zones; following Hurricane Katrina, the technology was analysed as a solution for reconstruction, and modern SIP structures are also approved for use in severe hurricane zones in Florida. MTB Modules homes are in use in Puerto Rico and in seismic zones, amongst other locations. For each overseas location, the requirements must be verified in the context of local structural adaptation.

The concept of stressed-skin/SIP construction has been in development since the 1930s. The experimental Forest Products Laboratory building, dating from 1937, remained in use for over 60 years. The durability of MTB ELEVEN depends primarily on correct installation, airtightness, protection of the timber and panels against prolonged dampness, and proper maintenance of the façade and roof. When installed correctly, this technology is designed for many years of use.

Personalisation10

7 variants (7.1–7.7), differing mainly in the number and layout of the glazing; 7.1 has 4 roof windows, whilst the subsequent variants have 8. When making your choice, you should compare the specific variant of the joinery and glazing.

No. In the standard version, the attic remains largely an open-plan space. You could, for example, create a leisure area, a study or additional bedrooms there, or extend the layout to include several rooms and a bathroom.

MTB ELEVEN is a ready-made model, so the basic structural layout is not treated as a design created from scratch. Changes to lightweight decorative elements may be possible during the finishing stage, whilst alterations to the structure, openings or load-bearing system require individual assessment. Before placing an order, it is advisable to describe the planned modification to the MTB team: contact@mtbmodules.com, +48 793 633 019.

Yes, at MTB ELEVEN, certain modifications to windows and doors are possible, provided they do not compromise the structural integrity, geometry or key design principles of the building. We assess each change on a case-by-case basis before confirming the order. Contact: contact@mtbmodules.com | +48 793 633 019.

MTB’s standard range is based on ready-made, fully developed Flat Pack™ models, including the MTB ELEVEN. A completely bespoke design is not automatically included in the standard range. If the project requires non-standard modifications, the scope must be agreed before placing an order: contact@mtbmodules.com, +48 793 633 019.

Yes, particularly when you order a package without selected finishing elements. However, any materials and solutions you provide must still meet the requirements for airtightness, ventilation, moisture protection, fire safety and load-bearing capacity. Structural elements must not be altered without design approval.

Yes, it may be possible to change the roof pitch, but this requires a case-by-case structural and design analysis. Such a modification may affect the structure, joinery, façades, flashings and documentation. We quote for this on a case-by-case basis. Contact: contact@mtbmodules.com | +48 793 633 019.

Yes, additional vertical windows may be possible, provided their location does not compromise the structure or the structural requirements of MTB ELEVEN. We assess and quote for each change on a case-by-case basis. Contact: contact@mtbmodules.com | +48 793 633 019.

Yes, in many cases this is possible, provided that the structural and functional requirements are met. Before approving any changes, we check their impact on the structure, façade and services. Contact: contact@mtbmodules.com | +48 793 633 019.

Modifications are possible provided they do not compromise the structural integrity of the building and can be correctly incorporated into the production documentation. We assess changes to openings, the roof pitch, the layout of selected walls or specific details on a case-by-case basis. Not every change will be possible in the finished model. Please send a description or sketch to contact@mtbmodules.com | +48 793 633 019.

Foundation3

For the MTB ELEVEN, we recommend that a foundation slab be constructed in accordance with the documentation and guidelines for this model. The client and their local contractors are responsible for the construction of the foundation.

No. As a standard, the foundation is the responsibility of the client. MTB provides the specifications required to prepare the foundations for the MTB ELEVEN; the construction of the foundation, earthworks and local utility connections are not included in the price of the package, unless a separate quotation expressly states otherwise.

The developer and their local contractors are responsible for preparing the foundation for the MTB ELEVEN. The foundation must be constructed in accordance with the documentation, and its geometry, level and installation points must be checked before assembly begins.

Preparing the plot4

Before delivery and the start of the MTB ELEVEN installation, the site should be properly prepared. Please ensure that:
- a foundation slab constructed correctly in accordance with the documentation,
- access for delivery vehicles,
- a place for the safe unloading and storage of parcels,
- access to electricity for the installation work,
- suitable conditions to ensure the safety of the team whilst they work.
If the installation is carried out by a team working with MTB Modules, sanitary facilities, such as a TOI TOI portable toilet, should also be provided on site.
Utility connections and service penetrations through the foundation must be prepared in accordance with the MTB ELEVEN documentation.
If there is no electricity supply on the plot, please inform MTB Modules of this before installation begins, so that the work and the necessary equipment can be planned accordingly.

No. MTB Modules does not carry out earthworks or prepare the site for the construction of MTB ELEVEN. Site preparation, earthworks, the laying of foundations and the installation of service connections are the responsibility of the developer and its local contractors.
MTB Modules, meanwhile, provides the documentation and technical guidelines required to prepare the site correctly for this model.
Before starting the installation, ensure that the foundation has been constructed in accordance with the documentation, that it is correctly aligned and level, and that all the necessary service penetrations have been prepared in the correct locations.

The Flat PackTM system is particularly advantageous where access is difficult, as the MTB ELEVEN is not transported as a single, ready-assembled unit. If necessary, the kit components can be broken down and transported to the site in smaller vehicles or minibuses. Before arranging transport, please send us photos and the access route dimensions: contact@mtbmodules.com | +48 793 633 019.

This may be possible, but the foundation system must be designed to suit the specific site and ground conditions. The MTB ELEVEN kit does not address differences in the plot’s elevation – this is the responsibility of the foundation design and site preparation.

Installation15

The current model specification states: from 3 people, approximately up to 20 days. The actual time may depend on the team’s experience, conditions on site and the selected scope of the kit.

The basic concept behind Flat Pack™ is the assembly of standard structural components without the use of a crane. Additional lifting equipment may be required for heavy glazing, in cases of difficult access, or for health and safety reasons.

Self-assembly does not invalidate the warranty, provided that the work is carried out in accordance with the instructions, documentation and warranty terms. The binding scope is set out in the warranty certificate for the specific set.

Yes. The ELEVEN MTB kit can be assembled by a team chosen by the investor. An MTB partner may also be available on the Polish market; for export markets, assembly is organised locally.

The MTB ELEVEN assembly instructions provide a step-by-step guide, from preparing the foundations through the construction process to the completion of the building. The documentation includes drawings, a sequence of works, lists of materials used at each stage, 2D drawings and a bill of materials (BOM).

The cost of installing MTB ELEVEN depends on the scope of work selected and the current availability of the installation team. On the Polish market, you select the installation method in the configurator, which displays a current summary. For non-standard locations or scopes of work, please contact MTB: contact@mtbmodules.com, +48 793 633 019.

The assembly of the MTB ELEVEN begins with an inspection of the prepared foundation; structural components are then assembled in accordance with the numbering and instructions, and the successive layers of the building – the roof, joinery and external elements – are completed in line with the selected scope. The documentation guides the team step by step; as a rough guide, this model requires a team of 3 people and takes approximately 20 days to complete.

The scope of liability depends on the contract and on who is carrying out the installation. The MTB warranty covers the scope specified in the set’s warranty certificate, whilst any installation faults should be reported to the installer and to MTB, accompanied by photographic evidence. In such a situation, please contact us immediately: contact@mtbmodules.com, +48 793 633 019.

Yes, but the open structure must be properly protected against water, wind and damage. You must not leave any exposed panel edges or an unclosed roof unprotected. Safe points at which to interrupt work should be specified in the installation instructions.

For assembling the house in the ‘House enclosed from the outside’ variant, we recommend: a short spirit level (approx. 60 cm), a long spirit level (180–200 cm), a cross-line laser, a marking cord, 2 5-metre tape measures, a tape measure of at least 15 metres and a construction square; 2 cordless impact drivers, 2 cordless screwdrivers, T20/T25/T30/T40 bits, a Phillips bit and an 8 mm socket, an angle grinder with discs, a 230 V hammer drill with 10–20 mm drill bits, a set of wood drill bits, an extension lead of approx. 40 m, a 230 V generator with a minimum output of 5–6 kW, and a hand-held circular saw; a rubber mallet, a silicone gun, a brush for bitumen emulsion, brushes/rollers/sandpaper, a cleaning tool for the foam gun, segment knives, sheet metal shears, roofing pliers and a wood wool cutter; 2 folding ladders, scaffolding, trestles, harnesses for working at height, window suction cups and 2 work lamps; as well as health and safety equipment, combination pliers, a crowbar and a basic cleaning kit. This list relates to building construction and does not include specialist tools for plumbing, electrical work, ventilation, heating and interior finishing.

Yes. Customers assembling the MTB ELEVEN themselves can access free remote support from MTB Modules regarding the interpretation of the instructions and the assembly sequence. If you have any questions, please send the stage number, the component code and photographs via the agreed contact channel.

Yes. Flat Pack™ kits can be assembled all year round, including in winter. Prefabricated construction technology does not require the typical construction delays associated with allowing walls to dry. However, health and safety conditions, rainfall, ice, wind and the requirements of manufacturers of foams, sealants, coatings and other materials used at each stage must be taken into account.

Yes. It is possible to agree the scope of the team’s work on a case-by-case basis – for example, commissioning only the structural work, the roof, the joinery or selected stages, whilst carrying out the remaining work yourself. Availability and price depend on the scope and location. Contact: contact@mtbmodules.com | +48 793 633 019.

MTB ELEVEN is designed to be assembled from numbered components following step-by-step instructions. If you have basic technical experience, can take accurate measurements, use a spirit level and power tools, and follow the instructions carefully, you should be able to assemble it yourself. This does not mean it is a one-person job – individual stages require a team, and for large glazed areas, 3–4 people are needed. When working at height or carrying out specialist work, always follow health and safety guidelines and, where necessary, consult professionals.

Yes. On request, we can provide a demo version of the assembly instructions so that you can see the labelling, the sequence of steps and the level of detail in the documentation before placing an order. Request a demo: contact@mtbmodules.com | +48 793 633 019.

Transport6

You can check the delivery cost for the MTB ELEVEN directly in the model configurator. Once you have selected the delivery address, the system will display the cost or explain how it is calculated. In the case of a non-standard route or international delivery, the cost may require individual confirmation.

No. The cost of transport is not included in the price of the ELEVEN MTB set. Delivery is priced separately, depending on the location, route and transport conditions.
Due to the size of the set, transporting the ELEVEN MTB requires two lorries for road transport or two 40HC sea containers for container transport.
You can check the current delivery cost in the configurator. For international deliveries, the cost may need to be calculated on a case-by-case basis.

Yes, delivery can be arranged to the specified address, provided that access and the unloading point allow for the delivery to be carried out safely. The final logistical arrangements are confirmed prior to transport.

Yes. The Flat Pack™ system is also designed for container transport, which is why the MTB ELEVEN can be shipped outside Europe.
For sea freight, one set of MTB ELEVEN requires two 40HC containers.
We organise international logistics, including sea freight. The cost and terms of delivery are calculated on a case-by-case basis for each specific port and destination.

Two 40HC containers are required to transport one ELEVEN MTB kit. This calculation is based on a kit without the polystyrene cladding. The final loading plan must be confirmed for the current order configuration and list of extras.

Yes. You can collect the MTB ELEVEN using your own transport directly from the factory and transport it to a location of your choice.
When transporting by road, please note that one complete set of MTB ELEVEN requires two semi-trailers. The vehicles and the method of securing the load must be appropriately selected to suit the dimensions, weight and number of packages.
The collection date, loading method and logistics arrangements must be agreed with MTB Modules prior to arrival.

Unloading4

Unloading of the ELEVEN MTB kit is organised by the customer or their team. MTB transport does not include unloading, so you must arrange for staff, equipment and a suitable place to store the components safely before delivery.

No. Unloading is not part of the standard transport service. The customer or their team must organise the staff, equipment and space required to unload MTB ELEVEN parcels safely.

The ELEVEN MTB kit can be unloaded manually; with enough people, this usually takes a few hours. However, we recommend using a forklift, as this significantly speeds up and simplifies the unloading process. The organisation and cost of the unloading equipment are the responsibility of the investor.

Yes. Unloading can be carried out manually and, with proper organisation, usually takes a few hours. However, for the sake of convenience and to speed up the work, we recommend using a forklift truck. The cost and organisation of the unloading equipment are the responsibility of the investor.

Installations4

This is not included in the standard scope of the Flat Pack™ house. The configurator may include optional component packages, but their installation, external connections, power supply, foundation penetrations and final inspections remain the responsibility of the client, unless otherwise stated in the quotation.

Not included in the standard scope of the Flat Pack™ house. Additional installation component packages may be available in the configurator, but their installation, external connections, power supply, penetrations through the foundations and final inspections remain the responsibility of the client, unless otherwise stated in the offer.

If a particular option is enabled in the MTB ELEVEN configurator, you can add a component package. The purchase of components alone does not imply that they will be installed on site. The current scope should always be checked in the configurator and the generated PDF quotation.

External connections and the supply of utilities to the building are to be arranged by the developer in accordance with local technical specifications. Entry points to the foundation should be prepared in accordance with the documentation for MTB ELEVEN.

Heating4

The heating source is selected based on the energy requirements of the MTB ELEVEN, the local climate and the system design. Possible options include, amongst others, electric solutions, underfloor heating or a heat pump, provided they are correctly designed. The configurator may include selected component packages, but their installation is not automatically included in the package.

Yes, underfloor heating can be included in the MTB ELEVEN installation design. The system must be selected to suit the floor structure, the planned finishing layers and the calculated heat demand. If a heating package is available in the configurator, check carefully whether it includes components or other elements within the scope as well.

Yes, provided that the installation is properly designed, the power ratings are correctly selected and the equipment is correctly mounted. Penetrations through partitions and the loads imposed must not compromise the structure or the airtightness of the building.

Yes. In MTB ELEVEN, as in other residential buildings, a wood-burning fireplace or other available heating source may be installed, provided it is properly designed. A flue or exhaust system, an air supply and the required clearances from combustible materials must be provided in accordance with the regulations and the manufacturer’s instructions.

Finishing touches3

The interior of the MTB ELEVEN remains unfinished and is prepared for the installation of services and further finishing layers. The furniture, fitted bathrooms, kitchen, finished flooring, light fittings and decorative items shown in the visualisations are not included in the standard package.

Yes. The investor may organise the interior finishing of the MTB ELEVEN themselves or hire their own contractors. The work must not compromise the structural elements and should take into account the requirements regarding installations, damp, ventilation and fire safety.

No. The finished floor is not included in the standard ELEVEN MTB kit. Once the house has been assembled, the client is responsible for laying the subsequent layers of the floor and applying the final finish in accordance with the design and the chosen method.

Facade and maintenance2

As standard, the MTB ELEVEN features a façade finished with white silicone plaster. In the ‘Externally enclosed house’ variant, the façade forms part of the building’s external finish.

The standard MTB ELEVEN façade is plastered and therefore does not require the regular waterproofing or maintenance typical of timber façades.
We do, however, recommend cleaning the façade periodically and inspecting its surface for dirt, micro-cracks or localised damage. If necessary, the façade can be repaired in specific areas or, after several years, given a fresh coat of paint in accordance with the manufacturer’s instructions for the plastering system used.

Administrative procedures4

It depends on the country, the region, the building’s intended use and local building regulations.
In Poland, a configurator may allow users to select a ready-made building design for use in the relevant administrative procedure. The design must then be adapted to the specific plot of land and local conditions. Under Polish regulations, depending on the type of development, either a planning permission or a notification procedure with a design may apply. gov.pl
Requirements may differ in overseas markets. MTB Modules can provide technical documentation for the MTB ELEVEN model, which can serve as a basis for a local architect, designer or structural engineer to prepare or adapt a design in accordance with the regulations in force in the relevant country.
Before starting a building project, you should always check the requirements in force in the area where the house is to be built.

Yes. The MTB ELEVEN building design must take into account the specific plot of land, local conditions, utility connections, location and administrative requirements. Abroad, the MTB documentation serves as the basis for adaptation by a local architect.

It is not possible to answer this question based solely on the model name. The procedure depends on current regulations, the building footprint, the purpose of the development, the plot, the Local Development Plan (MPZP) or Zoning Plan (WZ), and local conditions. Before purchasing, you must confirm the correct procedure for the specific plot with a planner or the relevant authority.

Yes. On the Polish market, the ELEVEN MTB configurator may include the option of a ready-made building design, which can be used in the subsequent administrative procedure. The design still needs to be adapted to the specific plot of land, local conditions and the requirements applicable at the site of the development.
In overseas markets, MTB Modules can provide technical documentation for the MTB ELEVEN model, which may serve as a basis for a local architect, designer or structural engineer to prepare or adapt a design in accordance with the regulations in force in the relevant country.
Please check the current scope of documentation and the available design options directly in the MTB ELEVEN configurator.

Price and costs4

The price depends on the kit variant selected and the market. The most reliable source is the current MTB ELEVEN configurator, which displays the price of the base kit, selected extras and delivery costs once you have entered your location. The generated PDF quote provides a detailed summary of the selected configuration.

No. Assembly is not included in the price of the ELEVEN MTB kit. The price of the house and the cost of assembly are charged separately.
The customer may choose to carry out the installation themselves, use their own team or — where this service is available — have the installation carried out by a team working in partnership with MTB Modules.
You can check the current installation cost and available options in the configurator.

Go to the MTB ELEVEN configurator, select the model, extras, installation method and delivery location, then download the PDF quote. If you need help with the configuration, please contact MTB: contact@mtbmodules.com, +48 793 633 019.

The Flat Pack™ kit is a product assembled to order. As a standard, the full cost of the kit is paid before it is released from the factory or dispatched – as is the case with other products prepared for collection and self-assembly. The customer may also collect the paid-for kit using their own transport. The detailed payment schedule is always set out in the documents for the specific order.

Funding6

For the Polish market, it is possible to express an interest in financing. The instalment simulation in the configurator is for guidance only and does not constitute a credit decision. For enquiries regarding financing for the MTB ELEVEN, please contact the MTB Modules Warsaw branch directly: warszawa@mtbmodules.com, +48 531 377 399, Skarbka z Gór 108, 03-287 Warsaw.

First, configure the MTB ELEVEN and specify the value of your planned order. Then complete the form, provide your contact details and submit the generated configuration.
Once you have submitted the form, our team will contact you to guide you through the next steps and help you submit your application to the relevant funding body.
The final decision and the binding terms and conditions of the financing depend on the funding institution, which assesses the customer’s creditworthiness and provides a personalised offer.
Contact regarding instalments:
MTB Modules Warsaw
+48 531 377 399
warszawa@mtbmodules.com

No. The instalment shown for the MTB ELEVEN is an indicative estimate. The actual interest rate, repayment period, required documents and creditworthiness depend on the financing institution’s current offer and the customer’s circumstances.

For information on financing the purchase of an MTB ELEVEN, please contact the MTB Modules Warsaw branch: Skarbka z Gór 108, 03-287 Warsaw, email warszawa@mtbmodules.com, tel. +48 531 377 399. For general enquiries, you can also email contact@mtbmodules.com or call +48 793 633 019.

This depends on the specific financial product and the terms and conditions of the financing institution. You should not assume that every element of the configuration will automatically be financed. It is best to prepare a complete MTB ELEVEN configuration and send it to the Warsaw branch: warszawa@mtbmodules.com, +48 531 377 399.

Yes, it is possible to obtain financing even if your income is earned abroad. The final decision and the documents required depend on the financing institution and the customer’s individual circumstances. For further details, please contact the finance department directly: MTB Modules Warsaw: warszawa@mtbmodules.com | +48 531 377 399.

Warranty3

The MTB website states that a warranty of up to 25 years is provided for the structure and key components of the building, even if you assemble it yourself. The detailed scope and durations for individual components are set out in the kit’s warranty certificate.

The scope of the warranty for the ELEVEN MTB set is set out in the warranty card provided with the order. Self-assembly does not invalidate the warranty, provided the work is carried out in accordance with the documentation and the terms of the warranty. Liability for errors made by the assembly team must be distinguished from the warranty covering the components supplied.

When submitting a report, please have your order number, item number (if applicable), a description of the problem and photos or a video to hand. Please send your report to contact@mtbmodules.com; for urgent matters, you can call +48 793 633 019. Do not fit a damaged part if its condition could affect safety or watertightness.

Production5

ELEVEN MTB components are prepared and numbered during production. The numbering corresponds to the documentation and the assembly sequence, so that the fitter can easily identify each part and where it is to be fitted.

Production of the MTB ELEVEN commences in accordance with the terms of the confirmed order, once the required formal and payment conditions have been met. The standard Flat Pack™ schedule provides for a 50% payment upon ordering and the remaining 50% prior to delivery of the kit; details are set out in the order documents.

Currently, the estimated production time for the MTB ELEVEN is up to 60 days. This lead time must be confirmed on a case-by-case basis when placing an order, as it may depend on the configuration, the completeness of the documentation and the current production schedule.

The main production facility for Flat Pack™ MTB Modules is located in Chojnice, Poland. MTB ELEVEN components are prepared, cut to size, marked and assembled there prior to dispatch.

We use European, certified materials from reputable manufacturers. We hold documentation and certificates for the components in the kit, including fasteners and screws. Specific brands and declarations may depend on the current production specifications.

Flat Pack™6

MTB ELEVEN is manufactured as a complete, numbered set of components, ready for transport and on-site assembly. The set is assembled on site in accordance with the documentation.

In traditional modular construction, finished or nearly finished three-dimensional structures are transported. With Flat PackTM, flat, numbered components are transported, which simplifies logistics and on-site assembly.

No. The MTB ELEVEN, using the Flat Pack™ system, is supplied as a numbered set of prefabricated components ready for assembly on site. This means there is no need to transport a finished structure.

Key components are prefabricated, prepared and labelled during production. Assembly should be carried out in accordance with the documentation for the specific kit. If the instructions do not specify any modifications to a component, it must not be altered without prior consultation.

ELEVEN MTB components are palletised and packed in accordance with the assembly sequence and divided into stages. The aim is to ensure that, during a given stage, the team can use the allocated package without having to unpack the entire delivery and search for parts.

The risk of error is minimised thanks to the individual labelling of components. Each prepared component has a unique symbol linked to the drawing and the relevant step in the instructions. Before assembly, you should always check the component’s symbol against the documentation.

Delivery5

Yes. Flat Pack™ MTB homes are ready for international delivery. MTB’s support covers configuration, technical documentation and logistics; assembly, unloading and local formalities are organised locally in accordance with the rules for the relevant market.

Any damage must be documented upon receipt and reported in accordance with the delivery procedure, stating the part number and a description of the problem. The part must not be fitted if the damage could affect safety or watertightness.

Yes. MTB delivers to markets in Europe and beyond, including by sea. The terms, documentation and transport costs for a specific country are confirmed on a case-by-case basis. Export enquiries: contact@mtbmodules.com, +48 793 633 019.

The problem must be documented upon receipt: take photographs, note the parcel or item number, and describe the condition of the consignment. You must then submit a report to MTB in accordance with the delivery documentation at contact@mtbmodules.com. If the damage could compromise safety, do not fit the part until the matter has been clarified.

Upon delivery, the kit must be protected from rainfall, standing water and prolonged exposure to damp. Packages should be placed securely off the ground and additionally covered with your own thick construction film or tarpaulin in a way that protects them from the weather but does not cause water to accumulate. Unpack the components in the order of assembly.

MTB Modules1

General contact details for MTB Modules: email contact@mtbmodules.com, tel. +48 793 633 019. The head office is normally open Monday to Friday from 8.00 am to 4.00 pm CET. When contacting us, please state the MTB ELEVEN model, the country and town where the project is located, and the planned scope of the kit.

Showrooms3

Yes. MTB Modules homes can be viewed at our showrooms and display sites. The availability of a specific MTB ELEVEN model may vary, so please check the current list in the Showrooms tab and book an appointment before you visit. General enquiries: contact@mtbmodules.com | +48 793 633 019.

The showroom display may vary, so please confirm the availability of a specific ELEVEN MTB model before you visit. Main showroom: Nieżywięć 335a, 77-300 Człuchów, showroom@mtbmodules.com, tel. +48 661 289 859. Please book your visit in advance.

MTB Modules main showroom: 335a Nieżywięć, 77-300 Człuchów. Showroom contact details: showroom@mtbmodules.com, tel. +48 661 289 859. General enquiries regarding MTB: contact@mtbmodules.com, +48 793 633 019. Visits are by appointment only.

B2B collaboration1

MTB Modules Warsaw branch / showroom: Skarbka z Gór 108, 03-287 Warsaw, email warszawa@mtbmodules.com, tel. +48 531 377 399. This is also the right point of contact if you’d like to discuss instalments and financing for the purchase of an MTB ELEVEN.

A model with an attic

Ready for
MTB ELEVEN?

We’ll put together a bespoke offer for you — for customers in Poland and around the world. Quickly, efficiently and with no strings attached.

PDF brochure

A detailed offer tailored to your needs.

Export services

Experience in project delivery in EU and non-EU markets.

Contact us within 24 hours

We reply quickly and to the point — usually within 24 hours.

Showroom
Nieżywięć 335a, 77-300 Człuchów
Opening hours
Mon–Fri: 8.00 am–4.00 pm CET