Home » Mobile Home

PREMIUM modular building systems

MOBILE HOME L

We present you a modern modular mobile house, all year round with an area of 40m2. It is a fully mobile structure based on a wood construction + SIP panels. Combined with Scandinavian construction timber and our patented technology, enters a new direction of construction.

For the construction of our houses, we use ONLY and ONLY top-shelf materials – everything and quality.
Steel – S355
Scandinavian Wood – C24
Sheathing of floors, walls and ceilings – SIP panel
Central steel frame  –insulated mineral wool 20mm and a SIP panel
PVC windows with triple glazing

Technical specifications

Total surface area
40 m2
Usable floor space
34.5 m2
Building surface area
40 m2
Length
10 m
Width
4 m

It offers the highest standard with its extraordinary functionality

The set consists of materials from renowned companies such as: Budmat, Swiss Krono, MTB Modules, Veka, Marcopol.

At the moment, the order fulfillment time is from 9 to 12 weeks from the date of signing the contract. The payment was divided into three stages: 40% of the order value up to three days from signing the contract, 20% during the contract, and the remaining 40% within 3 days before the transport from our warehouse or own collection.

How to place an order

  • Find a local distributor in our «Meet Us» section https://mtbmodules.com/about/meet-us/
    Contact him directly and he will surely guide you through the entire ordering process, right up to the delivery of the goods. It will also help you in organizing the assembly and arranging all formalities.

"Building a house has never been so easy"

READY MADE are models manufactured in our factory according to a predefined design. Depending on the project in our offer, the buildings can be partially or fully equipped.

KIT HOUSE from MTB Modules is a revolution in the construction market. We are a global supplier of houses that are assembled using assembly instructions. It is also a revolution in terms of cost and construction time. Do you know any other technology that will allow you to build a real and durable home in less than a week?
If you are interested in READY MADE houses, find them in our offer.

Structurally, MTB Modules buildings are equivalent to conventional buildings. Their life span and warranties are also similar. However, the overall quality of modular buildings is much higher due to the controlled manufacturing process.

The offer is just for you. We deliver our houses to private individuals, but also to significant developers who are fed up with traditional construction technology, which causes many problems and uncertainties.

The advantages of modular manufacturing are many, but a long-term partnership provides the opportunity to invest and jointly optimize the product in order to add value whilst lowering costs.

The modules can be placed on a sleeper wall system, a concrete podium, steel podium, or a ground floor slab.
For some of our KIT HOUSE house models, we offer prefabricated floor panels, which the investor installs on concrete piles prepared before installation. All dimensions and spacing of concrete piles are sent at the investor’s request.

100% of the construction is completed inside a factory, which mitigates the risk of weather delays, allowing projects to be completed in half the time of traditional construction.

Yes. We make individual projects, but only for mass production.

Yes it’s true. SIP technology was created in the US and Japan with thought. Time has shown that houses built in this technology were the only ones to survive in a Category 5 hurricane.

Yes. SIP houses are fully mortgageable.

All elements of the set have the necessary certificates, even the smallest screws. We only use materials from the best and well-known producers.

The first houses built in this technology are over 100 years old. Over the years, the technology and quality of building materials have improved several times, which results in even better durability of these structures.

No Harmful Chemicals

The components used to make SIPs (foam, oriented strand board, and adhesive) meet some of the most stringent standards for indoor air quality. EPS foam uses pentane, a non-CFC blowing agent that dissipates shortly after projection. The foam cores have no off-gassing.

SIP walls can bear considerable vertical and horizontal loads with reduced internal studding. The load carried by the SIP is transferred to ground by the OSB skins, held in position by the fully bonded insulation core.

The sound resistance of a SIP wall depends on the thickness of the gypsum drywall applied, the exterior finish applied, and the thickness of the insulating foam core that is used. SIPs are especially effective at blocking high frequency noise, and most homeowners notice the quiet comfort of a SIP home.

What exactly are you buying?

The mobile home MTB MOBILE HOME L. It is a fully mobile structure based on a solid frame, which in combination with Scandinavian construction wood and our patented technology, enters a new direction of construction.
The exact list of the contents of the set:
– 3x roof windows (triple glazed)
– front door
– bathroom window (three-pane)
– 3x balcony window (triple-pane)
– balcony door (triple-pane)
– a window in the corridor (three-pane)
– kitchenette with household appliances (dishwasher, fridge-freezer, oven, hood, induction hob, FRANKE sink
– bathroom equipped with a shower cabin 120×80 cm, a suspended toilet with a slow-closing board, a cabinet with a mirror, a washbasin
– master bedroom equipped with a double bedroom bed 160×200, premium mattress, built-in wardrobe, two bedside tables
– a smaller bedroom with two single beds, two bedside tables
– vinyl floor
– facade laths
– walls made of a special panel in white
– pleated blinds as standard in all windows
– chassis – steel frame with wheels on bearings
– TV / SAT connection cable hidden in the box
– socket under the house for underfloor heating
– an outlet outside the house
– LED lighting in all rooms

General information

  • The house, except for the living room, is finished and ready to move into.

  • Standard heating of the house with infrared or gas heaters (no gas boiler).

Transport

  • You don’t have to worry about transportation. We will comprehensively take care of the delivery of the order from our factory, to any location in the world indicated by you.

  • If you purchase more models, we calculate the required cargo space individually, taking into account one or more delivery addresses.

  • We deal with the customs process, we do not charge any fees for it.

  • Matters related to documentation before and during transport are organized with the help and involvement of our logistics department.

  • Regardless of whether it is sea or road transport, our logistics department will take care of all the procedures.

  • The cost of transport is calculated individually for each order.
    We attach all material certificates, from transport pallets to the smallest detail of the set, to the order file.

  • Unloading the goods. This is the stage usually performed by the client. The unloading date is usually known a few days in advance, so you can prepare for it.

See other houses 

Copyright © infoBrand, 2021

Produkt

Angebot

Information

Kontakt

contact@mtbmodules.com

Człuchowska 66
89-600 Chojnice
POLAND

Ir arriba
Contact | Kontakt